Abbey Road, London NW6

Sector: Residential
Scope: 92 No. 350mm, 236 No. 400mm diameter CFA piles and 18 No. 600mm diameter crane base piles
Duration: 7.5 weeks  Plant: Llamada P140
Strata: Made Ground over London Clay

Having achieved and maintained preferred client status with the Main Contractor, a value engineered solution was provided at tender stage to assist with the Main Contractor’s bid. The Sub-Contract Works were completed within the allotted programme and the project is situated just a few minutes from the famous Abbey Road Studios. This project was a good example of a working relationship that has been built between GMP and the main contractor over the years. This was the third phase of the Abbey Road development GMP have been involved in.